After sanding the bottom of the fuselage between the landing brake and the forward landing gear, it became obvious that there was…
Taping the front fuselage section floor joints: Cut enough cloth to make two 17″ x 2″ pieces of BID tape and two…
Glassing the Cozy MK IV floor Workshop temperature was 25 deg C and humidity 38%. The entire surface was covered with micro…
Permanent installation of the seat brace and the heat duct. Outside air temperature was -20 deg C and the workshop temperature was…
Here are a few short clips from today’s afternoon flight between Peterborough and Cobourg (Ontario, Canada). Flight Video It was intended to be…
Permanent installation of the lower firewall today. Firewall shimmed and level and clamped in position – ready for floxing. Shop temperature 25…
Prepared inboard foam shims for the lower firewall installation. Inboard foam shims 5-min epoxy’d in place. Electrical channels carved out on each…
Used 5 minute epoxy to install the outboard foam shims prior to lower firewall installation.
Interested in Suborbital Spaceflight? 20% off on The Suborbital Pilot’s Ground School Manual if you order before August 31, 2017 ! Our ground…
Traced the longeron and stringer holes from the temporary firewall to the permanent bottom half firewall and cut out the new holes.…
Recent Comments