Category Archive for "Parts & Services"

Cozy MKIV – November 10, 2019

Nov 10 2019

1/4″ holes drilled through the centre of each shoulder harness insert for the shoulder harness attachments. Trimmed and sanded the UND cloth…

Cozy MKIV – October 12, 2019

Oct 12 2019

The heat duct transition piece was cut at a 45 deg angle on the square end. The 1″ hole under the left…

Cozy MKIV – October 9, 2019

Oct 09 2019

Trimmed and sanded the transition piece then removed the inside foam and tape. Workshop temperature 24 deg C and humidity 55%. Mixed…

Cozy MKIV – October 7, 2019

Oct 07 2019

Workshop temperature was 24 deg C and the humidity was 58%. A batch of epoxy was mixed using 30g resin and 11g…

Cozy MKIV – October 5, 2019

Oct 05 2019

Trimmed and sanded the rough edges at the top back side of the seatback/shoulder support. Sanded a radius on the forward corner…

Cozy MKIV – October 2, 2019

Oct 02 2019

The foam edges around the plywood shoulder support inserts were beveled. Shop temperature 24 degC and humidity 60%. A batch of epoxy…

Cozy MKIV – September 26, 2019

Sep 26 2019

Trimmed and sanded smooth the headrest glassed edges. Trimmed and sanded the rear seat heat duct to size. Cut a 2″ long…

Cozy MKIV – September 25, 2019

Sep 25 2019

Sanded the inside of the shoulder brace as required (and vacuumed). Workshop temperature 24 deg C and humidity 61%. Mixed a batch…

Cozy MKIV – September 23, 2019

Sep 23 2019

Finished installing the canopy hinges by countersinking and fastening all machine screws (MS24694-65, -66, -70) in place using washers (AN960-416L) and nuts…

Cozy MKIV – September 16, 2019

Sep 16 2019

A foam template of the rear seat heat duct sides was made to fit between the front seatback and forward landing gear…