Archive for January, 2020

Cozy MKIV – January 25, 2020

Jan 25 2020

Trim, sand, and vacuum the aft heat duct. Cut 2-ply BID cloth @ 45 deg orientation and a piece of peel ply…

Cozy MKIV – January 18, 2020

Jan 18 2020

The areas where the birch plywood inserts are to be installed were sanded with 36 grit sandpaper. 7-ply BID cloth was cut…

Cozy MKIV – January 12, 2020

Jan 12 2020

Four angle brackets for the safety harness anchor points were fabricated from 1/8″ x 1″ x 1″ 2024T3 extruded aluminum angle. The…

Cozy MKIV – January 11, 2020

Jan 11 2020

Using a hack saw and file, the excess material from the four shoulder harness support tabs were removed and made flush with…

Cozy MKIV – January 4, 2020

Jan 04 2020

Workshop temperature was21 deg C and 46% humidity. A small batch of flox was mixed using 16g resin and 6g hardner along…

Sky King – January 2, 2020

Jan 02 2020

RC piloting practice continues with the Sky King to prepare for flying the X-15 Delta Rocket Glider. The Sky King climbed to…

Cozy MKIV – January 1, 2020

Jan 01 2020

A line was marked on the forward face of the front seatback where each of the four shoulder harness supports are located…