Cozy Experimental Aircraft Update – April 15, 2018

April 15, 2018
skycaptain

Removed the temporary board supporting the aft end of the floor then scraped the glue from the landing gear bulkhead.

Shop temperature 25 deg C and humidity 41%.

Cut 2 pieces of BID cloth 33″ x 2″.

Mixed a cup of epoxy using 112g resin and 42g hardner.

Wet out the 2-ply BID tape then applied epoxy to the corner of the landing gear and floor.

Mixed a batch of flox and applied it to the corner.

Cut out the BID tape and applied it to the corner and used a brush to stipple the tape.

No comments

You must be logged in to post a comment.