Archive for November, 2017

Cozy Experimental Aircraft Update – November 27, 2017

Nov 27 2017

Sanded corners on heat duct to ensure they are rounded. Drilled a hole in the glassed side of the seat brace to…

Cozy Experimental Aircraft Update – November 18, 2017

Nov 18 2017

Started the work session with coffee. Trimmed and sanded the edges of the 7-layer UND layup on the heat duct and the…

Propulsion System R&D – November 17, 2017

Nov 18 2017

The team met in the Cobourg workshop to progress the planning and design efforts for our integrated propulsion system development program.

Citabria Update – November 15, 2017

Nov 18 2017

Replaced the seized fuel valve in the Citabria, but first it took about 2 hours to drain out all of the fuel…

Citabria Update – November 11, 2017

Nov 12 2017

Rolling along the south shore of Rice Lake on an early Saturday morning winter flight. Flight Highlight Video Arrived at the airport…

Cozy Experimental Aircraft Update – November 5, 2017

Nov 05 2017

Workshop temperature was 25 degC and humidity 53%. A batch of epoxy was mixed with 132g resin and 50g hardner. Some of…