Cozy Experimental Aircraft Update – October 6, 2017

October 6, 2017
skycaptain

Drilled holes through the fiberglass in the triangular braces for the aluminum tube.

Used 5 minute epoxy to put the top pieces of the heat duct together.

Clamped the 3 heat duct pieces to a 2 x 4 for trial fit before floxing. This took awhile to get the pieces oriented and aligned correctly.

Shop temperature set to 25 deg C and humidity 52%.

40g resign and 15.2g hardner mixed with flox and applied to the heat duct to secure the sides to the top.

Curing in progress.

No comments

You must be logged in to post a comment.