Traced the longeron and stringer holes from the temporary firewall to the permanent bottom half firewall and cut out the new holes.…
Maintenance evening at the hangar … fuellin eatin cleanin …
A fantastic day of history and excitement was had at the Canadian Historical Aircraft Association in Windsor, Ontario. I had the great…
Aileron rolls and spins over the south shore of Rice Lake at 5000 ft. Click here for the video clip from the flight.
Click on the test headings for the video clips… The purpose of the Hyb-B test series is to develop a dependable ignition system…
Trimmed and sanded the 6-ply layup on the aft side of the forward landing gear bulkhead. Filed and sanded the 7/8″ holes…
Upon inception, Beyond Blue Aerospace (BBA) was to be a facilitator of suborbital flight training and awareness with an eye to being…
Click on the test headings for the video clips… Test Hyb-B-1 Test spark gap igniter at 4.8V and 1A. Test Hyb-B-2 Test…
Re-opening the 0.25″ holes and opening up the 0.875″ holes for the aileron torque tubes.
Workshop temperature was 25 deg C and humidity was 46%. 93g resin was mixed with 35g of hardner to make a batch…
Recent Comments